Survey Schedule

We’ve just started Phase Three of our Programme. The documents below will provide the planned timings for all of the scheduled surveys, for Phase 3, specific to each survey unit. In some cases these may differ from the Phase 2 survey schedules as the programme evolves to fit purpose.

Aerial Photography

Aerial Photography is scheduled to be flown in years two and three of the current phase of the programme. The summary below shows the areas scheduled to be flown in each year.

Phase 3 Aerial Photography Survey Schedule

Lidar

Lidar is scheduled to be flown in the first, third and fifth years of the current phase of the programme. The summary below shows the areas scheduled to be flown in each year.

Phase 3 Lidar Survey Schedule

Topographic Survey Schedule

These summaries give details of the survey programme for each survey unit where topographic surveys are carried out.

TWS01: Portland Bill - Start Point

TSWPCO: Start Point - Menabilly

TSW02: Menabilly - Land's End

TSW03: Land's End - Hartland Point

TSW04: Hartland Point - Second Severn Crossing